Kensington Park Apartment & Height
Kensington park community comprises of independent residential plots
and apartments...
Noida
Kensington Park Apartment & Heights - Overview
Resplendent with beautifully landscaped gardens and lining broad avenues, Jaypee Greens Kensington Park is a unique gated residential community within Wish Town Noida, created for exclusive living of select few, with dedicated spaces catering to all comforts you desired.
Kensington park community comprises of independent residential plots and apartments. The apartments are offered in two types, viz., Kensington Part Apartments and Kensington Park Heights. The 2/3/4 bhk apartments in Noida are available in various sizes ranging from 97.54 sq. mt to 195.09 sq. mt.
Special care has been taken to design the apartments with use of high quality materials and rich specifications that are aesthetically appealing. Jaypee Kensington Park Apartments Noida has 14 towers with 17 floors each and Kensington Heights have 3 towers with 19 floors each.
Being part of the Kensington Park community, residents of these Jaypee apartments enjoy access to various community features such as wide open spaces, tree lined walkways, parks, clubhouse with gym, party rooms, dining facilities and other outdoor sports facilities such as Tennis, Badminton, Squash, Table tennis.
Kensington Park Apartment & Heights - Features
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Kensington Park Apartment & Heights - Specification
| product level specifications | |
| Structure | R.C.C Framed Structure |
| Living Room, Dining Room & Lounge | |
| Floors | Tiles / Laminated floor / mosaic |
| External Doors and Windows | Aluminium Powder Coated / vUPVC |
| Walls | Internal : Oil bound distemper External : Good quality external grade paint |
| Internal doors | Enamel painted flush doors |
| Bedrooms & Dress | |
| Floors | Tiles / Laminated floor / mosaic |
| External Doors and Windows | Aluminium powder Coated / UPVC Doors- flush doors |
| Walls | Internal : Oil bound distemper External : Good quality external grade paint |
| Internal doors | Enamel painted flush doors |
| Toilets | |
| Floors | Anti Skid Ceramic / Vitrified Tiles |
| External Doors and Windows | Aluminium Powder Coated / UPVC Doors- flush doors |
| Fixture and Fittings | All provided of standard company make |
| Walls | Tiles in cladding upto 7' in shower area and 3'-6" in balance areas, Balance walls painted in oil bound distemper |
| Internal doors | Enamel painted Flush doors |
| Kitchen | |
| Floors | Anti Skid Ceramic / Vitrified Tiles |
| External Doors and Windows | Aluminium Powder Coated / UPVC |
| Fixture and Fittings | Marble Top with sink |
| Walls | Ceramic tiles 2'-6" above counter, Balances walls painted in Oil bound distemper |
| Balconies / Verandah | |
| Floors | Ceramic / vetrified Mosaic Tiles |
| Railings | MS Railing as per Design |
| Lift Lobbies / Corridors | |
| Floors | Ceramic / Mosaic Tiles / Marble / Kota or equivalent |
| Walls | Oil bound distemper |
Kensington Park Apartment & Heights - Floor Plans
Kensington Park Apartment & Heights - Price List
| BSP (psm) | BSP (psf) |
| Rs. 50,591 | Rs. 4700 |
Other Applicable Charges
| S. No. | Payment Head | Charges/Rate (psm) | Charges/Rate (psf) |
| 1 | Internal Development Charges (IDC) | Rs. 808/- psm | Rs. 75.00/- psf |
| 2 | External Development Charges (EDC) | Rs. 808/- psm | Rs. 75.00/- psf |
| 3 | Electric Sub Station Charges (ESSC) | Rs. 431/- psm | Rs. 40.00/- psf |
| 4 | One Time Lease Rent charges | Rs. 538 /- psm | Rs. 50.00/- psf |
| 5 | Social Club Membership | Rs. 1.00 Lac | |
| 6 | Compulsory Car Parking Space | One reserved basement car parking space compulsory with any apartment. | |
|
|||
*psf = per square feet
Notes:
- The Basic Sales Price (BSP) is for the indicated Super area and is not inclusive of other applicable charges mentioned above.
- Maintenance charges as per maintenance agreement shall be payable by the allottee separately.
- The interest Free Mainenance deposit @ Rs. 1076/- psm. (Rs. 100/- psf) of Super Area shall be payable before handing over possession of the premises to the allottee
- Maintenance charges for the 1st year shall be payable in advance at the time of offer of possession. @ Rs. 16/- psm. (Rs. 1.50/- psf.) per month
- The Super Areas mentioned in the brouchre and/or other documents are indicative only
- Additional basement storage (optional) @ Rs. 21528/-psm (Rs. 2000/- psf) payable at the time of offer of possession.
- All plans and layout are subject to change at the sole direction of the company or statutory authorities.
- Exact super area of Apartment shall be calculated at the time of handing over Possession of property as constructed. Increase / decrease area shall be charged proportionately as per the allotment terms.
- The super area means the covered area of the demised premises inclusive of the area under the periphery walls, area under columns and walls within the demised premises, half of the area of the wall common with the other premises adjoining the demised premises, cupboards, A/c ledges, plumbing / electric shafts of the demised premises, total area of the balconies and terraces, and proportionate share of the common areas like common lobbies, lift, shafts, common service shafts, staircases, machine room, mumty, water tank, electric substation, areas under other services and architectural features and other common areas etc.
- The other terms and conditions shall be as per the Application form, standard terms and conditions and the allotment letter of the company.
- The prices are subject to revision / withdrawal at any time without notice at the sole discretion of the company.
- Government taxes as applicable from time to time shall be payable by the allottee in addition to the price consideration as stated above.
- After issuance of PAL, transfer will be allowed only after minimum 30% of the total price consideration or the total dues whatever is higher, has been received from the allottee along with payment of administrative charges which are currently fixed at Rs. 538/- psm (Rs. 50/- psf). These administrative charges are subject to revision from time to time
Kensington Park Apartment & Heights - Payment Plan
| (A) INSTALLMENT LINKED PLAN | |||
| S. No | Payment Due On | Percentage (%) of BSP | Other Charges |
| 1 | On Booking along with Application form | As Applicable * | |
| 2 | On or within 1 month from the date of issuance of PAL |
20% of BSP (less Booking Amount *) |
|
| 3 | On or Before 3 months from the date of issuance of PAL | 10% of BSP | |
| 4 | On Commencement of excavation | 10% of BSP | |
| 5 | On laying of upper basement slab | 10% of BSP | |
| 6 | On laying of 3rd floor Roof slab | 7.5% of BSP | Car Park Charges |
| 7 | On laying of 6th floor Roof slab | 7.5% of BSP | IDC Charges |
| 8 | On laying of 9th floor Roof slab | 6.5% of BSP | EDC Charges |
| 9 | On laying of 12th floor Roof slab | 6.5% of BSP | |
| 10 | On laying of 15th floor Roof slab | 6% of BSP | Electric Substation Charges |
| 11 | On laying of top floor Roof slab | 6% of BSP | |
| 12 | On completion of internal plaster & flooring within the apartment |
5% of BSP | |
| 13 | On offer of possession | 5% of BSP | Social Club Charges + IFMD + Maintenance advance + One time Lease Rent Charges + Additional Basement Storage Charges (optional) |
| TOTAL | 100% | ||
* Booking amount: 5% of BSP
Notes :
- Installment under S. No. 4 - 12 may run concurrently with those under S. No. 1 - 3 based on the physical progress of Work at site.
- The demand letter for installments at S. No. 4 to 12 shall be sent in advance providing for payment period of up to 15 days.
| (B) DOWN PAYMENT PLAN : | |||
| S. No | Payment Due On | Percentage (%) of BSP |
Other Charges |
| 1 | On Booking along with Application form | As Applicable * | |
| 2 | On or within 1 month from the date of issuance of PAL |
95% of BSP (less Booking Amount *) |
IDC + EDC + Car park + Electric substation charges |
| 3 | On offer of possession | 5% of BSP | Social Club Charges + IFMD + Maintenance advance + One time Lease Rent Charges + Additional Basement Storage Charges (optional) |
| TOTAL | 100% | ||
NOTE: Down payment discount upto 15% of BSP or lower based on the stage of construction at the time of issuance of PAL
.....................................................................................................................................................................
Kensington Park heights
| (A) INSTALLMENT LINKED PLAN | |||
| S. No | Payment Due On | Percentage (%) of BSP | Other Charges |
| 1 | On Booking along with Application form | As Applicable * | |
| 2 | On or within 1 month from the date of issuance of PAL |
20% of BSP (less Booking Amount *) |
|
| 3 | On or Before 3 months from the date of issuance of PAL | 10% of BSP | |
| 4 | On Commencement of excavation | 10% of BSP | |
| 5 | On laying of upper basement slab | 10% of BSP | |
| 6 | On laying of 3rd floor Roof slab | 7.5% of BSP | Car Park Charges |
| 7 | On laying of 6th floor Roof slab | 7.5% of BSP | IDC Charges |
| 8 | On laying of 9th floor Roof slab | 6.5% of BSP | EDC Charges |
| 9 | On laying of 12th floor Roof slab | 6.5% of BSP | |
| 10 | On laying of 15th floor Roof slab | 6% of BSP | Electric Substation Charges |
| 11 | On laying of top floor Roof slab | 6% of BSP | |
| 12 | On completion of internal plaster & flooring within the apartment |
5% of BSP | |
| 13 | On offer of possession | 5% of BSP | Social Club Charges + IFMD + Maintenance advance + One time Lease Rent Charges + Additional Basement Storage Charges (optional) |
| TOTAL | 100% | ||
* Booking amount: 5% of BSP
Notes :
- Installment under S. No. 4 - 12 may run concurrently with those under S. No. 1 - 3 based on the physical progress of Work at site.
- The demand letter for installments at S. No. 4 to 12 shall be sent in advance providing for payment period of up to 15 days.
| (B) DOWN PAYMENT PLAN : | |||
| S. No | Payment Due On | Percentage (%) of BSP |
Other Charges |
| 1 | On Booking along with Application form | As Applicable * | |
| 2 | On or within 1 month from the date of issuance of PAL |
95% of BSP (less Booking Amount *) |
IDC + EDC + Car park + Electric substation charges |
| 3 | On offer of possession | 5% of BSP | Social Club Charges + IFMD + Maintenance advance + One time Lease Rent Charges + Additional Basement Storage Charges (optional) |
| TOTAL | 100% | ||
NOTE: Down payment discount upto 15% of BSP or lower based on the stage of construction at the time of issuance of PAL
New Town Heights - Construction Update
| Description of Tower | Construction Stage | Next Month Planning |
| Kensington Park Aptt. 1 | Brickwork and plaster in progress | Brickwork and plaster will continue |
| Kensington Park Aptt. 2 | Brickwork and plaster in progress | Brickwork and plaster will continue |
| Kensington Park Aptt. 3 | Brickwork and plaster in progress | Brickwork and plaster will continue |
| Kensington Park Aptt. 4 | Brickwork and plaster in progress | Brickwork and plaster will continue |
| Kensington Park Aptt. 5 | Casting of 17th FRS is completed | casting of 18th FRS will be completed |
| Kensington Park Aptt. 6 | Casting of 17th FRS is completed | casting of 18th FRS will be completed |
| Kensington Park Aptt. 7 | Casting of 16th FRS completed | casting of 17th FRS will be completed |
| Kensington Park Aptt. 8 | Casting of 16th FRS completed | casting of 18th FRS will be completed |
| Kensington Park Aptt. 9 | Casting of 13th FRS is completed | casting of 14th FRS will be completed |
| Kensington Park Aptt. 10 | Casting of 14th FRS is completed | casting of 15th FRS will be completed |
| Kensington Park Aptt. 11 | Brickwork and plaster works in progress | Brickwork and plaster works will be in progress |
| Kensington Park Aptt. 12 | Casting of 18th FRS is completed | Brickwork and plaster works will be in progress |
| Kensington Park Aptt. 14 | Casting of 17th FRS is completed | casting of 18th FRS will be completed |
| Kensington Park Aptt. 15 | Casting of 17th FRS is completed | casting of 18th FRS will be completed |
| Kensington Park Aptt. 16 | Casting of 15th FRS is completed | casting of 16th FRS will be completed |
| Kensington Park Height 1 | Brickwork and plaster works in progress | Brickwork and plaster works will be in progress |
| Kensington Park Height 2 | Casting of 17th FRS is completed | casting of 18th FRS will be completed |
| Kensington Park Height 3 | Brickwork and plaster works in progress | Brickwork and plaster works will be in progress |
Kensington Park Apartment & Heights - Site Plan
Kensington Park Apartment & Heights - Location Map
View Kensington Park Apartment & Heights on Google Map
Other JayPee Projects

JayPee Castille 2

JayPee Sun Court Tower 3

JayPee Sun Court

JayPee earth Court

JayPee Castille

JayPee Star Court

JayPee Sea Court

JayPee Spa Court

JayPee Moon Court

JayPee Crescent Court

JayPee Estate Homes

JayPee Villas

JayPee Town Homes

JayPee Kasablanca Tower

JayPee Kristal Court

JayPee Boomerang

JayPee Garden Isles

JayPee Pebble Court

JayPee The Orchards

JayPee Krescent Homes

JayPee Kube

JayPee Knights Court

JayPee Kasa Isles

JayPee Kensington Boulevard

JayPee Kensington Park Apartments

JayPee Kosmos

JayPee Wish Town Klassic

JayPee Klassic Heights

JayPee Pavilion Heights

JayPee Pavilion Court

JayPee Kalypso Court

JayPee Imperial Court

JayPee Kingswood Oriental

JayPee Kensington Park phase 1

JayPee Kensington Park 2

JayPee Udaan

JayPee NATURVUE APARTMENTS

JayPee Buddh circuit studios 2

JayPee Buddh circuit

JayPee Kassia

JayPee Kove

JayPee Villa Expanza

JayPee Bougainvilleas

JayPee Sunnyvale Homes

JayPee Greencrest Homes

JayPee Country Homes II

JayPee Yamuna Vihar

JayPee Country Homes

JayPee Krowns

JayPee Kensington Park

JayPee Atlantis

JayPee Town Centre

JayPee Golf course

JayPee Boomerang The Club

JayPee 18-Hole GolF

JayPee 9-Hole GolF

JayPee SCO

JayPee Aman

JayPee Aman-2